About the property
Infrastructure nearby
Planning and prices
Promotions
Financing
Construction progress
Documents
Orlan Residents житловий комплекс
Orlan Residents житловий комплекс Photo (2)
Orlan Residents житловий комплекс Photo (9)
1st payment from 30 %
1 / 9

Orlan Residents житловий комплекс

from 1 050 $ / m²

~ from 1 050 ₴ / m²

Orlan Residents житловий комплекс

Sales Department

Ukraine, Lviv, Lychakivskyi District, Plastova st., 4

Mon - Fri

Sat

07:00 - 16:00

08:00 - 13:00

About Property

ORLAN RESIDENTS is a unique development creating a modern, comfortable neighborhood. An investment-worthy project combining contemporary architectural solutions for residents. Layouts are designed for modern family needs. Large windows provide natural light, and ergonomic room placement creates a spacious, cozy atmosphere. The architectural approach blends innovation with aesthetics. The project features residential sections from 5 to 10 floors with breaks for commercial spaces, giving buildings a modern, functional look. A durable ventilated facade highlights the commercial line. Energy-efficient glazing systems are included. High-quality facade plaster adds a distinctive character. Colors and shades are carefully chosen for a dynamic, engaging composition.

Construction stages

Active construction

Sales status

Active

Advantages

Closed parking

Guest parking

Children's playground

Sports playground

Landscaping of the territory

Closed territory

Technical specifications

Property Class

Comfort

Number of sections / buildings

10

Number of Floors

5 - 10

Construction Technology

Monolithic Frame

Heating

Individual

Walls

Ceramic Blocks

Infrastructure nearby

Preschools

Educational institutions

Medical facilities

Shopping centers and supermarkets

Parks

Cafes and restaurants

Planning, visualization and prices

Flats

Promotions

Housing for IDPs

May request — buy housing with new vouchers. Resident Development starts working with new housing vouchers and invites you for a consultation.

5% Discount

Paying 100% for an apartment during construction shows strong loyalty to any developer. We value this trust and offer discounts.

Financing conditions

Developer's installment plan

1st payment from 30%

Up to 2 years

eRecovery

Resident Development participates in the state program “єВідновлення.” Now you can buy an apartment in our residential complexes using a housing certificate as compensation for damaged or destroyed property. We comply with the program’s requirements and provide full legal and organizational support for the transaction.

Construction Progress

Construction Progress Orlan Residents житловий комплекс 2 quarter 2026
1 / 3

2 quarter 2026

Section C3: monolithic work completed on floors 9-10. Section C4: finishing installation of double-glazed transparent structures. Section C5: partition walls built on floors 4 and 2. Section C6: partition walls completed from floors 3 to 6. Section C1: wall masonry finishing on floors 7-8. Section D5: monolithic work completed on floors 6-7. Section D3: preparatory work done for tower crane installation (foundation concreting for crane KB completed).
Construction Progress Orlan Residents житловий комплекс 1 quarter 2026
1 / 3

1 quarter 2026

Section 3: monolithic work completed on floors 3, 4, and 5. Installing the slab for the 6th floor. Section 4: finishing installation of aluminum facade structures and metal-plastic windows. Elevator equipment installed. Section 1: masonry completed on floors 3 and 4; masonry ongoing on floors 5 and 6. Installed collective smoke extraction system (SKD). Section 6: elevator equipment installed. Cement-lime plaster applied on walls from 2nd to 8th floor.
Construction Progress Orlan Residents житловий комплекс 4 quarter 2025
1 / 3

4 quarter 2025

Section 4: Continuing facade work. Section 6: Roof layers poured. Waterproofing the roof and finishing the entrance masonry. Section 1: Parapet masonry completed. Section 5: Floors 3-5 poured. Section 2: Excavated foundation pit and poured base concrete.
Construction Progress Orlan Residents житловий комплекс 3 quarter 2025
1 / 1

3 quarter 2025

Section 4: 8th floor walls sealed. Ventilation ducts on the roof completed. Window installation ongoing. Section 6: 1st floor walls sealed. Section 1: Floor slab poured for 5th floor; slabs for 6th and 7th floors poured. Section 5: Excavation done; base concrete and cushion poured.
Construction Progress Orlan Residents житловий комплекс 2 quarter 2025
1 / 3

2 quarter 2025

The 7th floor of section 4 has been poured. The 4th floor of section 6 has been poured. The warehouse within the footprint of section 1 has been demolished. Excavation for the foundation pit of section 1 has begun.