1st payment from 30 %
1 / 10
Premium Residents житловий комплекс
from 2 200 $ / m²
~ from 2 200 ₴ / m²
About Property
A boutique-style building for the discerning. Only 19 apartments. Maximum privacy. Minimalism that highlights character. Here, rarely combined elements meet: the calm of a residential street and convenient proximity to Lviv’s key spots. The center is close. Infrastructure is close. And the feeling of harmony is within.
Construction stages
Under construction
Sales status
Booking is open
Advantages
Closed parking
Landscaping of the territory
Closed territory
Elevator
Shelter
Panoramic windows
Closed parking
Landscaping of the territory
Closed territory
Elevator
Shelter
Panoramic windows
Technical specifications
Property Class
Business
Number of sections / buildings
1
Number of Floors
6
Construction Technology
Monolithic Frame
Heating
Individual
Walls
Ceramic Red Brick
Property Class
Business
Number of sections / buildings
1
Number of Floors
6
Construction Technology
Monolithic Frame
Heating
Individual
Walls
Ceramic Red Brick
Insulation
Mineral Wool
Infrastructure nearby
Preschools
Educational institutions
Medical facilities
Shopping centers and supermarkets
Parks
Cafes and restaurants
Preschools
Educational institutions
Medical facilities
Shopping centers and supermarkets
Parks
Cafes and restaurants
Post offices
Banks
Sport centers
Planning, visualization and prices
Financing conditions
Developer's installment plan
1st payment from 30%
For 24 months.
eRecovery
Resident Development participates in the state program “єВідновлення.” Now you can buy an apartment in our residential complexes using a housing certificate as compensation for damaged or destroyed property. We comply with the program’s requirements and provide full legal and organizational support for the transaction.
Construction Progress
1 / 2
3 quarter 2026
1. Completed monolithic works on the 1st floor.
2. Removing formwork from the 1st floor slab and preparing for formwork installation on the 2nd floor slab.
3. Finishing vertical elements on the 2nd floor.
4. Starting masonry work in basement engineering rooms (electrical panel/pump room).
1 / 3
2 quarter 2026
1. Completed installation of vertical elements on the 1st floor.
2. Started work on the 1st floor slab.
3. Applied vertical waterproofing to parking walls.
4. Finished insulating exterior walls in the shelter area (preparing for backfilling).
5. Completed backfilling of cavities.
6. Constructed reinforced concrete ramp for parking entrance.